Q. : Which of the following will NOT be detected by static analysis?
A. Parameter type mismatches.
B. Errors in requirements.
C. Undeclared variables.
D. Uncalled functions.
B is correct
 

<<<<<< =================== >>>>>>
Q.: Which of the following would be a valid measure of test progress?

A. Number of undetected defects.
B. Total number of defects in the product.
C. Number of test cases not yet executed.
D. Effort required to fix all defects.
 
C is correct
<<<<<< =================== >>>>>>

Q. : In a system designed to work out the tax to be paid:
An employee has �4000 of salary tax free.
The next �1500 is taxed at 10%.
The next �28000 after that is taxed at 22%.
Any further amount is taxed at 40%.
To the nearest whole pound, which of these groups of numbers fall into three DIFFERENT equivalence classes?
 
A. �4000; �5000; �5500.
B. �32001; �34000; �36500.
C. �28000; �28001; �32001.
D. �4000; �4200; �5600.

D is correct
 

<<<<<< =================== >>>>>>
Q. : Which of the following test activities can be automated?
i Reviews and inspections.
ii Metrics gathering.
iii Test planning.
iv Test execution.
v Data generation.
 

A. i, iii, iv.
B. i, ii, iii.
C. ii, iv, v.
D. ii, iii, v.

C is correct
 

<<<<<< =================== >>>>>>
  Q. : In a REACTIVE approach to testing when would you expect the bulk of the test design work to be begun? 
 A. After the software or system has been produced.
B. During development.
C. As early as possible.
D. During requirements analysis.

A is correct
 

<<<<<< =================== >>>>>> 
Q.: Which statement about expected outcomes is FALSE?  
A. Expected outcomes are defined by the software's behaviour
B. Expected outcomes are derived from a specification, not from the code
C. Expected outcomes should be predicted before a test is run
D. Expected outcomes may include timing constraints such as response times

A is correct
 

<<<<<< =================== >>>>>> 
 Q.: Functional system testing is: 
 A. Testing that the system functions with other systems
B. Testing that the components that comprise the system function together
C. Testing the end to end functionality of the system as a whole
D. Testing the system performs functions within specified response times

C is correct
 

<<<<<< =================== >>>>>> 
 Q.: Which of the following items would not come under Configuration Management? 
A. Operating systems
B. Test documentation
C. Live data
D. User requirement documents

C is correct
 

<<<<<< =================== >>>>>> 
Q.: What is NOT included in typical costs for an inspection process?  
A. Setting up forms and databases
B. Analysing metrics and improving processes
C. Writing the documents to be inspected
D. Time spent on the document outside the meeting

C is correct
 

<<<<<< =================== >>>>>> 
Q.: Which of the following statements about component testing is FALSE?  
A. Black box test design techniques all have an associated test measurement technique
B. White box test design techniques all have an associated test measurement technique

C. Cyclomatic complexity is not a test measurement technique
D. Black box test measurement techniques all have an associated test design technique

 A is correct
 <<<<<< =================== >>>>>>

Q.: Why can be tester dependent on configuration management?
A. Because configuration management assures that we know the exact version of the testware and the test object
B. Because test execution is not allowed to proceed without the consent of the change control board
C. Because changes in the test object are always subject to configuration management
D. Because configuration management assures the right configuration of the test tools
A is correct
<<<<<< =================== >>>>>>
Q.: Why is successful test execution automation difficult?
A. Because the tools for automated testing require too much effort for learning
B. Because the maintenance of the test system is difficult
C. Because the test robot tools are restricted in their ability to recognize outputs
D. Because the test robot needs to be supported by a test management.

B is correct
 

<<<<<< =================== >>>>>> 
Q.: Why is it necessary to define a Test Strategy? 
A. As there are many different ways to test software, thought must be given to decide what will be the most effective way to test the project on hand.
B. Starting testing without prior planning leads to chaotic and inefficient test project
C. A strategy is needed to inform the project management how the test team will schedule the test-cycles
D. Software failure may cause loss of money, time, business reputation, and in extreme cases injury and death. It is therefore critical to have a proper test strategy in place.
D is correct
 

<<<<<< =================== >>>>>>
Q.: Which of the following is not considered as a benefit of testing tools?
A. Ability to detect tiny changes that a human could not
B. Easy to implement and maintain
C. Test assets are more consistent
D. Ease of measurement of software quality

B is correct
 

<<<<<< =================== >>>>>>  
Q.: Which of the following options is not related to static testing?
A. Test data preparation tools
B. Early defect detection
C. Scribe
D. Compilers

A is correct
 

<<<<<< =================== >>>>>>  
Q.: Which of the following is not a part of Configuration Management?
A. Controlled library access
B. Record of changes to documentation over time
C. Auditing conformance to ISO9001
D. Identification of test versions

C is correct
 

<<<<<< =================== >>>>>>  
Q. : Though activities in the Fundamental test process may overlap or occur concurrently, identify the logical sequential process.
(i) Test Implementation and Execution
(ii) Test Closure activities
(iii) Evaluating exit criteria and reporting
(iv) Test Planning and Control
(v) Test Analysis and Design

A. iv � v � iii � ii � i
B. v � i � iii � ii � iv
C. iv � v � i � iii � ii
D. v � ii � iii � i � iv

C is correct
<<<<<< =================== >>>>>>
    