Papers Q. 201 to 210


Q.: The inputs for developing a test plan are taken from
A. Project plan
B. Business plan
C. Support plan
D. None of the above
A is correct
 

<<<<<< =================== >>>>>>
Q.: A tool that supports traceability, recording of incidents or scheduling of tests is

called:
A. A dynamic analysis tool
B. A test execution tool
C. A debugging tool
D. A test management tool
E. A configuration management tool
D is correct
<<<<<< =================== >>>>>>
Q.: Which of the following is not a static testing technique
A. Error guessing
B. Walkthrough
C. Data flow analysis
D. Inspections

A is correct
 

<<<<<< =================== >>>>>>
Q.: Which  document  specifies  the  sequence  of test  executions?
A. Test  procedure  specification
B. Test  design  specification
C. Test  case  specification

D. Test  plan

A is correct

<<<<<< =================== >>>>>>
Q.: Inspections can find all the following except 
 

A. Variables not defined in the code
B. Spelling and grammar faults in the documents

C. Requirements that have been omitted from the design documents
D. How much of the code has been covered

D is correct 

<<<<<< =================== >>>>>> 
Q.: Which of the following is not a characteristic for Testability? 
 A. Operability
B. Observability

C. Simplicity
D. Robustness
  

D is correct 
<<<<<< =================== >>>>>> 
Q.: Software testing accounts to what percent of software development costs? 
 A. 10-20
B. 40-50
C. 70-80
D. 5-10
 

B is correct  
<<<<<< =================== >>>>>>  
Q.: Which  tool  can be  used to  support and  control  part of  the test  management  process? 
A. Coverage  management  tool
B. Test  management  tool

C. Data  preparation  tool

D. Performance  testing  tool
B is correct
 

<<<<<< =================== >>>>>>  
Q.: If an expected result is not specified then: 
A. We cannot run the test
B. It may be difficult to repeat the test

C. It may be difficult to determine if the test has passed or failed
D. We cannot automate the user inputs

C is correct
 

<<<<<< =================== >>>>>> 
Q.: When should we stop our testing? 
 A. This question is difficult to answer
B. The answer depends on the contract with the client, special requirements if any & risks your organization is willing to take

C. The answer depends on the experience & maturity of your developers
D. The answer should be standardized for the software development industry

B is correct
<<<<<< =================== >>>>>>
Q.: Which of the following best describes integration testing?
A. Testing performed to expose faults in the interfaces and in the interaction between integrated components.
B. Testing to verify that a component is ready for integration.
C. Testing to verify that the test environment can be integrated with the product.
D. Integration of automated software test suites with the product.
A is correct
<<<<<< =================== >>>>>>
Q.: According to the ISTQB Glossary, debugging:
A. Is part of the fundamental testing process.
B. Includes the repair of the cause of a failure.
C. Involves intentionally adding known defects.
D. Follows the steps of a test procedure.

B is correct
 

<<<<<< =================== >>>>>>
Q.: Which of the following could be a root cause of a defect in financial software in which an incorrect interest rate is calculated?
A. Insufficient funds were available to pay the interest rate calculated.
B. Insufficient calculations of compound interest were included.

C. Insufficient training was given to the developers concerning compound interest alculation rules.
D. Inaccurate calculators were used to calculate the expected results.

C is correct
<<<<<< =================== >>>>>>
Q.: Assume postal rates for 'light letters' are:
$0.25 up to 10 grams;
$0.35 up to 50 grams;
$0.45 up to 75 grams;
$0.55 up to 100 grams.
Which test inputs (in grams) would be selected using boundary value analysis?
 

A. 0, 9,19, 49, 50, 74, 75, 99,100
B. 10, 50, 75,100, 250, 1000
C. 0, 1,10,11, 50, 51, 75, 76,100,101
D. 25, 26, 35, 36, 45, 46, 55, 56

C is correct
 

<<<<<< =================== >>>>>>
Q.: What is exploratory testing?
A. The process of anticipating or guessing where defects might occur.
B. A systematic approach to identifying specific equivalent classes of input.
C. The testing carried out by a chartered engineer.
D. Concurrent test design, test execution, test logging and learning.

D is correct 

<<<<<< =================== >>>>>> 
Q.: What does it mean if a set of tests has achieved 90% statement coverage?
A. 9 out of 10 decision outcomes have been exercised by this set of tests.
B. 9 out of 10 statements have been exercised by this set of tests.
C. 9 out of 10 tests have been run on this set of software.
D. 9 out of 10 requirements statements about the software are correct.

B is correct
 

<<<<<< =================== >>>>>> 
Q.: A test plan is written specifically to describe a level of testing where the primary goal is establishing confidence in the system. Which of the following is a likely name for this document? 
A. Master test plan
B. System test plan
C. Acceptance test plan
D. Project plan

C is correct
 

<<<<<< =================== >>>>>>
Q.: What is the best description of static analysis? 
A. The analysis of batch programs
B. The reviewing of test plans
C. The analysis of program code or other software artifacts
D. The use of black-box testing

C is correct
 

<<<<<< =================== >>>>>> 
Q.: System test execution on a project is planned for eight weeks. After a week of testing, a tester suggests that the test objective stated in the test plan of 'finding as many defects as possible during system test' might be more closely met by redirecting the test effort according to which test principle? 
A. Impossibility of exhaustive testing.
B. Importance of early testing.
C. The absence of errors fallacy.
D. Defect clustering.

D is correct
 

<<<<<< =================== >>>>>>  
 






No comments:

Post a Comment

To bring all feasible courses , online and easy to use...