1)which of the following agile methology focuses lightweight processes wthich allows for rapid changes?
   a)Scrum
   b)Relation Unless process
   c)Dynamic System development
   d)Anamorphic development
2)which of the following phases of software development life cycle describes desired features and operations in details, including screan layouts, business rules, process diagrams, psedudo code and other documentation?
  a)System analyses
  b)Maintance
  c)Permantany analysis
  d)System Design
3)____ is an extension of the maintance stage and may be referred to in some circles as post implantation review?
  a)System Design
  b)System Analyses
  c)Acceptance
  d)Evaution
4)In which of the following envionment business stakeholdes can test against their original business?
   a) System intergration testion
   b)Development
   c)Comman build
   d)User acceptance testion
 5)______ is the process of analyzing a task to develop a conceptual model that can then be used to complete task?
    a) Software development model
    b)System intergration testing
    c)Both A & B
    d)Object oriented analyses
  6)which of the following object oriented model is the result of object oriented analysis that captures concept in the problem domain?
     a)Use Case
     b)System sequence Diagram
     c)Conceptual model
    d)Relational Data Model
7)which of the following Model is an abstract model that describes how data is respresented and used?
    a)User interface model
    b)Conceptual model
    c)Management Model
     d)Relation Model
8)_______ is a picture that for a particular scenario of a use case , the events that external actors generate , thair order , and possible inter-system events?
   a)Relational Diagram
   b)Iterative Diagram
   c)Instagram Diagram
   d)System Sequence Diagram
9)_____ is the process used to obtain a product or service in accordance with the acquirer' requrements?
   a)Agreements Process
   b)System Analyses process
   c)Anomaly
   d)Acquisition process
10)______ is the assessment, calculation,or breakdown of an item under test to determine that the perceived information is correct , the process of taking the immediate data or presentation and  either decomposing it or combining it with other information to assure that the item under test to correct?
  a)Acquisition
  b)Agreements
  c)Testing
  d)Analysis
11)_____ is a limitation or implied requirements that constrains the design solution or implementation of the system engineering process, is not changeable by the enterprise , and  is generally non-allocable?
   a)Audit
   b)Configuration
   c)Contraint
   d)Correctness
12)______ is a process used to select the most beneficial course of project where alternative  exist?
   a)Deliverable
   b)Analysis
   c)Data Testing
   d)Decision Making Process
13)______ is a process used to build a system or system component?
   a)Constraint
   b)Development process
   c)Testing
   d)None of above
14)which of the following model starts with an initial pass through a standard-ed waterfall life cycle using a subset of the total requirements to  develop a robust prototype?
  a)Waterfall
  b)agile software development
  c)integration development
  d)Spiral model
15)in which of the following process, draft deliverable are generated for formal review and comments?
   a)Informal iteration
   b)In stage assessment
   c)Formal iteration
    d)None of above
16)In which of the following stage the refernce data is finalized for production use and production user are identified and linked to their appropriate roles?
   a)Development
   b)Analysis
   c)Design
   d)Integration and test
17)which of the following is the component of the test plan?
   a)Responsibility
   b)Test
   c)Assumption
   d)All the above
18)_____ is a document that defines a test item and specifies a set of test input or data , execution condition, and exected results?
    a)Test Case
    b)Test Script
    c)Test Plan
    d)Test run
19)______ is a software development methodology that uses minimal planning in favor of rapid prototype?
   a)Spiral model
   b)Rapid Application Development
   c)Software testing
   d)Software integration
20)______ is a software development methodology that uses minimal panning  in favor  of  rapid  prototype?
  a)Spiral model
  b)Rapid application development
  c)Software testing
  d)Software interrogation
21)which of the following type of test is based on a repeatable environment so  that the same test run under the same conditions will yield results that you can legitimately compare?
  a)Basis Test
  b)White box
  c)Benchmark test
  d)Blackbox test
22)_____ is fault in a program which causes the program to performed in an unintended?
  a)Mistake
  b)Error
  c)Alert
  d)Bug
23)_____ is a graphical representation of inputs or stimuli with their associated outputs which can be used to design test cases?
  a)Repay tool
  b)Capability maturity model
  c)Cause effect graph
  d)critical path analysis
24)A formal testing technique where source code is traced by a group with a small test case  while the state of program variables in manually monitored, to analyze the programer's logic and assumption is called_____.
   a)Code Inspection
   b)Conformance testing
   c)Unit Testing
   d)Code Walkthrough
25)The diagrammatic representation of the possible alternative control flow  paths through a components is called___.
 a)Control flow graph
 b)cause path analysis
  c)Critical path analysis
  d)Gantt chart
26)_____ is a term used in system engineering , information systems and software engineering to describe a process for planning , creating , testing , and deploying and information system?
  a)Software Management Process
  b)Software development life cycle
  c)Software testing
  d)None of above.













   