Papers Q. 121 to 130


Q.: Test Implementation and execution has which of the following major tasks?
i. Developing and prioritizing test cases, creating test data, writing test procedures and optionally preparing the test harnesses and writing automated test scripts.
ii. Creating the test suite from the test cases for efficient test execution.
iii. Verifying that the test environment has been set up correctly.
iv. Determining the exit criteria
A. i,ii,iii are true and iv is false
B. i,,iv are true and ii is false
C. i,ii are true and iii,iv are false
D. ii,iii,iv are true and i is false

 A is correct
<<<<<< =================== >>>>>>
Q.: One of the fields on a form contains a text box which accepts numeric values in the range of 18 to 25. Identify the invalid Equivalance class
A. 17
B. 19
C. 24
D. 21

A is correct
 

<<<<<< =================== >>>>>>
Q.: Exhaustive Testing is
A. Is impractical but possible
B. Is practically possible
C. Is impractical and impossible
D. Is always possible

C is correct
 

<<<<<< =================== >>>>>>  
Q.: Which  tool  needs  to  interface  with other  office  automation  software  in order  to  generate reports  in  the  format  required  by the  organization? 
 A. Progress  tracking  tools
B. Test  management  tools
C. Metrics  management  tools
D. Test  execution  tools

B is correct
<<<<<< =================== >>>>>>
 

Q.: Which one is not comes under international standard 
A. IEC
B. IEEE
C. ISO
D. All of the above

B is correct
 

<<<<<< =================== >>>>>> 
Q.: In which phase static tests are used  
A. Requirements
B. Design
C. Coding
D. All of the above

D is correct
 

<<<<<< =================== >>>>>>
Q.: What's the disadvantage of Black Box Testing  
A. Chances of having repetition of tests that are already done by programmer.
B. The test inputs needs to be from large sample space.
C. It is difficult to identify all possible inputs in limited testing time. So writing test cases is slow and difficult
D. All above

D is correct
 

<<<<<< =================== >>>>>>  
Q.: What  is  the  process  of  analyzing  and  removing  causes  of  failures  in  software?
A. Validation
B. Testing
C. Debugging
D. Verification

C is correct
<<<<<< =================== >>>>>>

Q.: Majority of system errors occur in the _________ phase
A. Requirements Phase.
B. Analysis and Design Phase
C. Development Phase
D. Testing Phase

A is correct
 

<<<<<< =================== >>>>>> 
 Q.: Which  of  the  following is  a  MAJOR  task  when  evaluating  the  exit  criteria? 
A. Creating  test  suites  and  cases  for  efficient  execution
B. Writing  a  test  summary  report  for  stakeholders
C. Handing  the  testware  to  the  maintenance  organization
D. Identifying  any  required  infrastructure  and  tools

B is correct 
 

<<<<<< =================== >>>>>>
Q.: Which of the following is a test type?
A. Component testing
B. Functional testing
C. System testing
D. Acceptance testing
B is correct
 

<<<<<< =================== >>>>>>
Q.: Which of the following
A. Feasibility
B. Usability
C. Maintenance
D. Regression

B is correct
 

<<<<<< =================== >>>>>> 
Q.: Which of these is a functional test?  
A. Measuring response time on an on-line booking system.
B. Checking the effect of high volumes of traffic in a call-center system.
C. Checking the on-line bookings screen information and the database contents against the information on the letter to the customers.
D. Checking how easy the system is to use.

C is correct
 

<<<<<< =================== >>>>>>  
 Q. 654: Which of the following is a true statement regarding the process of fixing emergency changes?
A. There is no time to test the change before it goes live, so only the best developers should do this work and should not involve testers as they slow down the process.
B. Just run the retest of the defect actually fixed.
C. Always run a full regression test of the whole system in case other parts of the system have been adversely affected.
D. Retest the changed area and then use risk assessment to decide on a reasonable subset of the whole regression test to run in case other parts of the system have been adversely affected.

D is correct
 

<<<<<< =================== >>>>>> 
Q.: A regression test:  
A. Is only run once.
B. Will always be automated.
C. Will check unchanged areas of the software to see if they have been affected.
D. Will check changed areas of the software to see if they have been affected.

C is correct
 

<<<<<< =================== >>>>>> 
Q.: Non-functional testing includes:  
A. Testing to see where the system does not function correctly.
B. Testing the quality attributes of the system including reliability and usability.
C. Gaining user approval for the system.
D. Testing a system feature using only the software required for that function.

B is correct

<<<<<< =================== >>>>>>
Q.: Which of the following artifacts can be examined by using review techniques?
A. Software code
B. Requirements specification
C. Test designs
D. All of the above
D is correct
 
<<<<<< =================== >>>>>> 
Q.: Which statement about the function of a static analysis tool is true? 
A. Gives quality information about the code without executing it.
B. Checks expected results against actual results.
C. Can detect memory leaks.
D. Gives information about what code has and has not been exercised.
A is correct
 
<<<<<< =================== >>>>>> 
Q.: Which is not a type of review? 
A. Walkthrough
B. Inspection
C. Informal review
D. Management approval
D is correct
 
<<<<<< =================== >>>>>> 
Q.: What statement about reviews is true? 
A. Inspections are led by a trained moderator, whereas technical reviews are not necessarily.
B. Technical reviews are led by a trained leader, inspections are not.
C. In a walkthrough, the author does not attend.
D. Participants for a walkthrough always need to be thoroughly trained.
A is correct
<<<<<< =================== >>>>>>



 
 

No comments:

Post a Comment

To bring all feasible courses , online and easy to use...