Q.: What is failure?
A. Deviation from expected result to actual result
B. Defect in the software.
C. Error in the program code.
D. Fault in the system.
A is correct
<<<<<< =================== >>>>>>
Q.: Which test support tool can be used to enforce coding standards?
A. Static analysis tool
B. Performance testing tool
C. Test comparator
D. Test management tool
A is correct
<<<<<< =================== >>>>>>
Q.: Which of the following is least important in test management?
A. Estimating test duration.
B. Incident Management.
C. Configuration Management.
D. De-bugging.
D is correct
<<<<<< =================== >>>>>>
Q.: A standard for software testing terminology is:
A. IEEE 802.11
B. ISO 9001
C. BS 7925-1
D. BS 7925-2
C is correct
<<<<<< =================== >>>>>>
Q.: Which of the following is NOT a characteristic of User Acceptance Testing?
A. Use of automated test execution tools.
B. Testing performed by users.
C. Testing against acceptance test criteria.
D. Integration of system with user documentation.
A is correct
<<<<<< =================== >>>>>>
Q.: Which of the following provides the biggest potential cost saving from use of CAST?
A. Test management
B. Test design
C. Test planning
D. Test execution
D is correct
<<<<<< =================== >>>>>>
Q.: What type of testing is done to supplement the rigorous testing?
A. Regression testing.
B. Integration testing.
C. Error Guessing
D. System testing.
C is correct
<<<<<< =================== >>>>>>
Q.: To make a test effective it is most important that:
A. It is easy to execute.
B. It is designed to detect faults if present.
C. The expected outcome is specified before execution.
D. It is unlikely to delay progress.
C is correct
<<<<<< =================== >>>>>>
Q.: Error guessing is:
A. An appropriate way of deriving system tests.
B. Only used if good requirements are not available.
C. Only used when good requirements are available.
D. The most appropriate way of deriving system tests.
D is correct
<<<<<< =================== >>>>>>
Q.: Amount of testing performed will not depend on
A. Risks involved
B. Contractual requirements
C. Legal requirements
D. Test data.
D is correct
<<<<<< =================== >>>>>>
Q.: During which activity of the Fundamental Test Process do you compare actual with expected results?
A. Test closure activities
B. Evaluating exit criteria and reporting
C. Test analysis and design
D. Test implementation and executionD is correct
<<<<<< =================== >>>>>>
Q.: Which one of the following pairs of factors is used to quantify risks?
A. Impact and Cost
B. Likelihood and Impact
C. Product and Project
D. Probability and Likelihood
B is correct
<<<<<< =================== >>>>>>Q.: Which of the following BEST describes a keyword-driven testing approach?
A.
Test input and expected results are stored in a table or spreadsheet,
so that a single control script can execute all of the tests in the
table
B.
Action-words are defined to cover specific interactions in system
(e.g., log-on entries) which can then be used by testers to build their
tests
C. Keywords are entered into a test harness to obtain pre-defined test coverage reports
D. The test basis is searched using keywords to help identify suitable test conditions
B is correct
<<<<<< =================== >>>>>>
Q.: Which of the following is a TYPICAL objective of a pilot project for introducing a testing tool into an organization?
A. To assess whether the benefits will be achieved at a reasonable cost
B. To identify the initial requirements of the tool
C. To select the most suitable tool for the intended purpose
D. To document test design and test execution processes
A is correct
A is correct
<<<<<< =================== >>>>>>
Q.: Which activity in the Fundamental Test Process creates test suites for efficient test execution?
A. Implementation and execution
B. Planning and control
C. Analysis and design
D. Test closure
A is correct
<<<<<< =================== >>>>>>
Q.: What does a test execution tool enable?
A. Tests to be executed automatically, or semi automatically
B. Tests to be written without human intervention
C. Preparation of test data automatically
D. Manage test assets such as test conditions and test cases
A is correct
<<<<<< =================== >>>>>>
Q.: What is the purpose of configuration management in testing?
a. To choose and implement a suitable configuration management tool.
b. To identify unique items of testware and their related developed software.
c. To provide traceability between items of testware and developed software.
d. To enable managers to configure the software.
e. To control the versions of software released into the test environment.
A. a, c and e
B. a, b and d
C. b, c and d
D. b, c and e
D is correct
<<<<<< =================== >>>>>>
Q.: Which of the following best describes the purpose of non-functional testing?
A. To measure characteristics of a system which give an indication of how the system performs its functions
B. To ensure that a system complies with the quality standards set by ISO 9126
C. To ensure that the system deals appropriately with software malfunctions
D. To measure the extent to which a system has been tested by functional testing
A is correct
<<<<<< =================== >>>>>>
Q.: Which one of the following methods for test estimation rely on information captured from previous projects?
A. Test point-based
B. Expert-based
C. Metrics-based
D. Development effort-based
C is correct
<<<<<< =================== >>>>>>
Q.: Arrive-and-Go airline wants to clarify its baggage handling
policy, whilst maximizing revenues, and will introduce the following
tariffs for all baggage per individual customer (weights are rounded up
to the nearest 0.1Kg):
The first 2Kg will be carried free of charge.
The next 10 Kg will be carried for a flat charge of $10.
An additional 15Kg will be charged a total charge of $17.
Luggage over this amount will be charged at $5 per Kg, up to a maximum of 150Kg per person.
No passenger may take more that 150Kg with them.
Which of the following would constitute boundary values for baggage weights in the price calculation?
A. 0, 5.0, 10.0, 17.0
B. 2.0, 9.9, 15.0, 26.9
C. 1.9, 12.0, 14.9, 150.0
D. 2.0, 12.1, 27.0, 150.1D is correct
<<<<<< =================== >>>>>>