Q.: In ______ testing doesn't know anything about the sofware being tested; it just clicks or types randomly.
A. Random testing
B. Gorilla testing
C. Adhoc testing
D. Dumb monkey testing
D is correct
<<<<<< =================== >>>>>>
Q.: A series of probing questions about the completeness and attributes of an application system is called
A. Checklist
B. Checkpoint review
C. Decision table
D. Decision tree
A is correct
<<<<<< =================== >>>>>>
Q.: The testing technique that requires devising test cases to demonstrate that each program function is operational is called
A. Black-box testing
B. Glass-box testing
C. Grey-box testing
D. White-box testing
C is correct
<<<<<< =================== >>>>>>
Q.: A white box testing technique that measures the number of or percentage of decision directions executed by the test case designed is called
A. Condition coverage
B. Decision/Condition coverage
C. Decision Coverage
D. Branch coverage
B is correct
<<<<<< =================== >>>>>>
Q.: Which summarizes the testing activities associated with one or more test design specifications.
A. Test Summary report
B. Test Log
C. Test Incident Report
D. Test Script
C is correct <<<<<< =================== >>>>>>
Q.: Which test investigates both functional and non-functional system requirements?
A. Alpha testing
B. System testing
C. Acceptance testing
D. Confirmation tesingting
B is correct
<<<<<< =================== >>>>>>
Q.: Which test ensures that modifications did not introduce new problems?
A. Stress testing
B. Black-box testing
C. Structural testing
D. Regression testing
D is correct
<<<<<< =================== >>>>>>
Q.: Which of the following are potential benefits of adding tools to the test process?
I. Reduction of repetitive testing procedures.
II. Ability to hire testers with fewer technical skills.
III. Ability to get an objective assessment of progress.
IV. Greater consistency in testing procedures.
A. II, III and IV
B. I, III and IV
C. I, II and III
D. I, II and IV
B is correct
<<<<<< =================== >>>>>> Q.: Which testing is used to verify that the system can perform properly when internal program or system limitations have been exceeded
A. Stress Testing
B. Load Testing
C. Performance Testing
D. Volume testing
A is correct
<<<<<< =================== >>>>>>
Q.: In any software development life cycle (SDLC) model, which of the following are characteristics of good testing?
I. Providing complete test coverage of all branches of the system code.
II. Having a corresponding testing activity for each development activity.
III. Testers should be involved in reviewing documents as soon as drafts are available.
IV. Each test level has test objectives specific to that level.
A. II, III and IV
B. I and III
C. I, III and IV
D. I and II
A is correct
<<<<<< =================== >>>>>>
Q.: When choosing which technique to use in a given situation, which factors should be taken into account?
V. previous experience of types of defects found in this or similar systems
W. the existing knowledge of the testers
X. regulatory standards that apply
Y. the type of test execution tool that will be used
Z. the documentation available
A. V, W, Y and Z
B. V, W and Y
C. X and Y
D. V, W and Y
B is correct
<<<<<< =================== >>>>>>
Q.: Why is independent testing important?
A. Independent testing is usually cheaper than testing your own work.
B. Independent testing is more effective at finding defects.
C. Independent testers should determine the processes and methodologies used.
D. Independent testers are dispassionate about whether the project succeeds or fails.
B is correct
<<<<<< =================== >>>>>>
Q.: Which of the following is among the typical tasks of a test leader?
A. Develop system requirements, design specifications and usage models.
B. Handle all test automation duties.
C. Keep tests and test coverage hidden from programmers.
D. Gather and report test progress metrics.
D is correct
<<<<<< =================== >>>>>>
Q.: According to the ISTQB Glossary, what do we mean when we call someone a test manager?
A. A test manager manages a collection of test leaders.
B. A test manager is the leader of a test team or teams.
C. A test manager gets paid more than a test leader.
D. A test manager reports to a test leader.
B is correct
<<<<<< =================== >>>>>>
Q.: What is the primary difference between the test plan, the test design specification, and the test procedure specification?
A. The test plan describes one or more levels of testing, the test design specification identifies the associated high-level test cases and a test procedure specification describes the actions for executing a test.
B. The test plan is for managers, the test design specification is for programmers and the test procedure specification is for testers who are automating tests.
C. The test plan is the least thorough, the test procedure specification is the most thorough and the test design specification is midway between the two.
D. The test plan is finished in the first third of the project, the test design specification is finished in the middle third of the project and the test procedure specification is finished in the last third of the project.
A is correct
<<<<<< =================== >>>>>>
Q.: Which of the following factors is an influence on the test effort involved in most projects?
A. Geographical separation of tester and programmers.
B. The departure of the test manager during the project.
C. The quality of the information used to develop the tests.
D. Unexpected long-term illness by a member of the project team.
C is correct
<<<<<< =================== >>>>>>
Q.: The ISTQB Foundation Syllabus establishes a fundamental test process where test planning occurs early in the project, while test execution occurs at the end. Which of the following elements of the test plan, while specified during test planning, is assessed during test execution?
A. Test tasks
B. Environmental needs
C. Exit criteria
D. Test team training
C is correct
<<<<<< =================== >>>>>>
Q.: Consider the following exit criteria which might be found in a test plan: I. No known customer-critical defects.
II. All interfaces between components tested.
III. 100% code coverage of all units.
IV. All specified requirements satisfied.
V. System functionality matches legacy system for all business rules.
Which of the following statements is true about whether these exit criteria belong in an acceptance test plan?
A. All statements belong in an acceptance test plan.
B. Only statement I belongs in an acceptance test plan.
C. Only statements I, II, and V belong in an acceptance test plan.
D. Only statements I, IV, and V belong in an acceptance test plan.
D is correct
<<<<<< =================== >>>>>>
Q.: According to the ISTQB Glossary, what is a test level?
A. A group of test activities that are organized together.
B. One or more test design specification documents.
C. A test type.
D. An ISTQB certification.
A is correct
<<<<<< =================== >>>>>>
V. previous experience of types of defects found in this or similar systems
W. the existing knowledge of the testers
X. regulatory standards that apply
Y. the type of test execution tool that will be used
Z. the documentation available
A. V, W, Y and Z
B. V, W and Y
C. X and Y
D. V, W and Y
B is correct
<<<<<< =================== >>>>>>
Q.: Why is independent testing important?
A. Independent testing is usually cheaper than testing your own work.
B. Independent testing is more effective at finding defects.
C. Independent testers should determine the processes and methodologies used.
D. Independent testers are dispassionate about whether the project succeeds or fails.
B is correct
<<<<<< =================== >>>>>>
Q.: Which of the following is among the typical tasks of a test leader?
A. Develop system requirements, design specifications and usage models.
B. Handle all test automation duties.
C. Keep tests and test coverage hidden from programmers.
D. Gather and report test progress metrics.
D is correct
<<<<<< =================== >>>>>>
Q.: According to the ISTQB Glossary, what do we mean when we call someone a test manager?
A. A test manager manages a collection of test leaders.
B. A test manager is the leader of a test team or teams.
C. A test manager gets paid more than a test leader.
D. A test manager reports to a test leader.
B is correct
<<<<<< =================== >>>>>>
Q.: What is the primary difference between the test plan, the test design specification, and the test procedure specification?
A. The test plan describes one or more levels of testing, the test design specification identifies the associated high-level test cases and a test procedure specification describes the actions for executing a test.
B. The test plan is for managers, the test design specification is for programmers and the test procedure specification is for testers who are automating tests.
C. The test plan is the least thorough, the test procedure specification is the most thorough and the test design specification is midway between the two.
D. The test plan is finished in the first third of the project, the test design specification is finished in the middle third of the project and the test procedure specification is finished in the last third of the project.
A is correct
<<<<<< =================== >>>>>>
Q.: Which of the following factors is an influence on the test effort involved in most projects?
A. Geographical separation of tester and programmers.
B. The departure of the test manager during the project.
C. The quality of the information used to develop the tests.
D. Unexpected long-term illness by a member of the project team.
C is correct
<<<<<< =================== >>>>>>
Q.: The ISTQB Foundation Syllabus establishes a fundamental test process where test planning occurs early in the project, while test execution occurs at the end. Which of the following elements of the test plan, while specified during test planning, is assessed during test execution?
A. Test tasks
B. Environmental needs
C. Exit criteria
D. Test team training
C is correct
<<<<<< =================== >>>>>>
Q.: Consider the following exit criteria which might be found in a test plan: I. No known customer-critical defects.
II. All interfaces between components tested.
III. 100% code coverage of all units.
IV. All specified requirements satisfied.
V. System functionality matches legacy system for all business rules.
Which of the following statements is true about whether these exit criteria belong in an acceptance test plan?
A. All statements belong in an acceptance test plan.
B. Only statement I belongs in an acceptance test plan.
C. Only statements I, II, and V belong in an acceptance test plan.
D. Only statements I, IV, and V belong in an acceptance test plan.
D is correct
<<<<<< =================== >>>>>>
Q.: According to the ISTQB Glossary, what is a test level?
A. A group of test activities that are organized together.
B. One or more test design specification documents.
C. A test type.
D. An ISTQB certification.
A is correct
<<<<<< =================== >>>>>>