Q.: From a Testing perspective, what are the MAIN purposes of Configuration Management?:
i) Identifying the version of software under test.
ii) Controlling the version of testware items.
iii) Developing new testware items.
iv) Tracking changes to testw are items.
v) Analysing the need for new testware items.
A. ii, iv and v.
B. ii, iii and iv,
C. i, ii and iv.
D. i, iii and v.
C is correct
<<<<<< =================== >>>>>>
Q.: Which of the following is a MAJOR task of test planning?
A. Scheduling test analysis and design tasks.
B. Initiating corrective actions.
C. Monitoring progress and test coverage.
D. Measuring and analyzing results.
A is correct
<<<<<< =================== >>>>>>
Q.: Based on the IEEE Standard for Software Test Documentation (IEEE Std 829 - 1998), which of the following sections are part of the test summary report?
a) Summary
b) Test incident report identifier
c) Test deliverables
d) Risks and contingencies
e) Variances
f) Approvals
g) Output specifications
A. a, e and f
B. a, c and d
C. a, b and f
D. a, d and e
A is correct
<<<<<< =================== >>>>>>
Q.: Which is a potential product risk factor?
A. Failure of third party vendor
B. Training issues
C. Problems requirements definition
D. Poor software functionality
D is correct
<<<<<< =================== >>>>>>
Q.: Who typically use static analysis tools?
A. Customers and users
B. Developers and designers
C. Business and systems analysts
D. System and acceptance testers
B is correct
<<<<<< =================== >>>>>>
Q.: Who would USUALLY perform debugging activities?
A. Developers.
B. Analysts.
C. Testers.
D. Incident Managers.
A is correct
<<<<<< =================== >>>>>>
Q.: Which of the following would you NOT usually find on a software incident report?
A. The name and / or organisational position of the person raising the problem.
B. Version of the Software Under Test.
C. Suggestions as to how to fix the problem.
D. Actual and expected results.
C is correct
<<<<<< =================== >>>>>>
Q.: Which of the following defines the expected results of a test?
A. Test case specification.
B. Test design specification.
C. Test procedure specification.
D. Test results.
A is correct
<<<<<< =================== >>>>>>
Q.: Some tools are geared more for developer use. For the 5 tools listed, which statement BEST details those for developers
i) Performance testing tools.
ii) Coverage measurement tools.
iii) Test comparators.
iv) Dynamic analysis tools.
v) Incident management tools.
A. i, iii. and iv. are more for developers.
B. ii. and iv. are more for developers.
C. ii, iii and iv. are more for developers.
D. ii. and iii. are more for developers.
B is correct
<<<<<< =================== >>>>>>
Q.: Which of the following is NOT a reasonable test objective:
A. To find faults in the software
B. To prove that the software has no faults
C. To give confidence in the software
D. To find performance problems
B is correct
<<<<<< =================== >>>>>>
Q.: Which of the following uses Impact Analysis most?
A. Component testing
B. Non-functional system testing
C. User acceptance testing
D. Maintenance testing
D is correct
<<<<<< =================== >>>>>>
Q.: What type of review requires formal entry and exit criteria, including metrics:
A. Walkthrough
B. Inspection
C. Management review
D. Post project review
B is correct
<<<<<< =================== >>>>>>
Q.: Maintenance means
A. Updating tests when the software has changed
B. Testing a released system that has been changed
C. Testing by users to ensure that the system meets a business need
D. Testing to maintain business advantage
B is correct
<<<<<< =================== >>>>>>
Q.: A Test Plan Outline contains which of the following:-
i. Test Items
ii. Test Scripts
iii. Test Deliverables
iv. Responsibilities
A. I,ii,iii are true and iv is false
B. i,iii,iv are true and ii is false
C. ii,iii are true and i and iv are false
D. i,ii are false and iii , iv are true
B is correct
<<<<<< =================== >>>>>>
Q.: All of the following might be done during unit testing except
A. Desk check
B. Manual support testing
C. Walkthrough
D. Compiler based testing
B is correct
<<<<<< =================== >>>>>>
Q.: Which of the following is a requirement of an effective software environment?
I. Ease of use
II. Capacity for incremental implementation
III. Capability of evolving with the needs of a project
IV. Inclusion of advanced tools
A.I, II &III
B.I, II &IV
C.II, III&IV
D.I, III&IV
A is correct
<<<<<< =================== >>>>>>
Q.: When testing a grade calculation system, a tester determines that all scores from 90 to 100 will yield a grade of A, but scores below 90 will not. This analysis is known as:
A. Equivalence partitioning
B. Boundary value analysis
C. Decision table
D. Hybrid analysis
A is correct
<<<<<< =================== >>>>>>
Q.: The bug tracking system will need to capture these phases for each bug.
I. Phase injected
II. Phase detected
III. Phase fixed
IV. Phase removed
A. I, II and III
B. I, II and IV
C. II, III and IV
D. I, III and IV
B is correct
<<<<<< =================== >>>>>>
Q.: Which of the following software change management activities is most vital to assessing the impact of proposed software modifications?
A. Baseline identification
B. Configuration auditing
C. Change control
D. Version control
C is correct
<<<<<< =================== >>>>>>
No comments:
Post a Comment