Papers Q. 21 to 30


Q.: When should configuration management procedures be implemented?

A. During test planning.
B. During test analysis.
C. During test execution.
D. When evaluating exit criteria

A is correct
<<<<<< =================== >>>>>>  
Q.: Which of the following are characteristic of regression testing ?
i) Regression testing is run ONLY once
ii) Regression testing is used after fixes have been made
iii) Regression testing is often automated
iv) Regression tests need not be maintained
Options:

A. ii, iv.
B. ii, iii.
C. i, iii, iv.
D. iii.
B is correct
 

<<<<<< =================== >>>>>> 
Q. 24: Which of  the  problems  below  BEST  characterize  a  result of  software  failure? 
A. Damaged  reputation
B. Lack  of  methodology
C. Inadequate  training
D. Regulatory  compliance

A is correct

<<<<<< =================== >>>>>>
Q.: Which of the following activities should be performed during the selection and implementation of a testing tool?
i) Investigate the organisation's test process.
ii) Conduct a proof of concept.
iii) Implement the selected tool on a project behind schedule to save time.
iv) Identify coaching and mentoring requirements for the use of the selected tool.
Options:

A. i, ii, iii.
B. ii, iii, iv.
C. i, iii, iv.
D. i, ii, iv.

 D is correct
<<<<<< =================== >>>>>>

Q.: What is the MAIN benefit of designing tests early in the life cycle?
A. It is cheaper than designing tests during the test phases.
B. It helps prevent defects from being introduced into the code.
C. Tests designed early are more effective than tests designed later.
D. It saves time during the testing phases when testers are busy.

B is correct
<<<<<< =================== >>>>>> 
Q.: Which of the following benefits are MOST likely to be achieved by using test tools?
i) Easy to access information about tests and testing.
ii) Reduced maintenance of testware.
iii) Easy and cheap to implement.
iv) Greater consistency of tests.
Options:

A. ii and iv
B. ii and iii
C. i and iv
D. i and iii
C is correct
 
<<<<<< =================== >>>>>>  
Q.: Which  of  the  following  can be  considered  as  success  factors  when  deploying a  new  tool in  an  organization? 
A. Providing  coaching to  users and  defining usage  guidelines
B. Monitoring  tool usage  and  reducing the need for  risk  analysis
C. Improving  processes  and  focusing  more on  component  testing
D. Assessing  testing  completion  and  minimizing  code  reviews
A is correct
 
<<<<<< =================== >>>>>>  
Q.: What is the purpose of exit criteria? 
A. To define when a test level is complete.
B. To determine when a test has completed.
C. To identify when a software system should be retired.
D. To determine whether a test has passed.
A is correct
 
<<<<<< =================== >>>>>>  
Q.: Which  test  design  technique  relies  heavily  on prior  thorough  knowledge  of the  system? 
A. Data  driven  testing technique
B. Experience-based  technique
C. White-box  technique
 

D. Structure-based  technique
B is correct 
<<<<<< =================== >> 

Q.: An expert based test estimation is also known as
A. Narrow band Delphi
B. Wide band Delphi
C. Bespoke Delphi
D. Robust Delphi
B is correct
 

<<<<<< =================== >>>>>>
Q.: A test harness is a
A. A high level document describing the principles, approach and major objectives of the organization regarding testing
B. A distance set of test activities collected into a manageable phase of a project
C. A test environment comprised of stubs and drives needed to conduct a test
D. A set of several test cases for a component or system under test

C is correct
<<<<<< =================== >>>>>>
Q.: �Be bugging� is known as
A. Preventing the defects by inspection
B. Fixing the defects by debugging
C. Adding known defects by seeding
D. A process of fixing the defects by tester

C is correct
<<<<<< =================== >>>>>>
Q.: A project manager has been transferred to a major software development project that is in the implementation phase. The highest priority for this project  manager should be to

A. Establish a relationship with the customer
B. Learn the project objectives and the existing project plan
C. Modify the project� s organizational structure to meet the manager�s management style
D. Ensure that the project proceeds at its current pace

B is correct
<<<<<< =================== >>>>>>

Q.: "This life cycle model is basically driven by schedule and budget risks" This statement is best suited for 
A. Water fall model
B. Spiral model
C. Incremental model
D. V-Model
D is correct
 
<<<<<< =================== >>>>>> 
Q.: Which of the following characteristics is primarily associated with software reusability? 
A. The extent to which the software can be used in other applications
B. The extent to which the software can be used by many different users
C. The capability of the software to be moved to a different platform
D. The capability of one system to be coupled with another system
A is correct
 
<<<<<< =================== >>>>>> 
Q.: Which of the following functions is typically supported by a software quality information system? 
I. Record keeping
II. System design
III. Evaluation scheduling
IV. Error reporting

A.I, II&III
B.II, III &IV
C.I, III &IV
D.I, II & IV
C is correct
 
<<<<<< =================== >>>>>> 
Q.: System test can begin when? 
 I. The test team competes a three day smoke test and reports on the results to the system test phase entry meeting
II. The development team provides software to the test team 3 business days prior to starting of the system testing
III. All components are under formal, automated configuration and release management control
A. I and II only
B. II and III only
C. I and III only
D. I, II and III
D is correct
 
<<<<<< =================== >>>>>> 
Q.: �Defect Density� calculated in terms of 
A. The number of defects identified in a component or system divided by the size of the component or the system
B. The number of defects found by a test phase divided by the number found by that test phase and any other means after wards
C. The number of defects identified in the component or system divided by the number of defects found by a test phase
D. The number of defects found by a test phase divided by the number found by the size of the system
A is correct
 
<<<<<< =================== >>>>>> 
Q.: Test charters are used in ________ testing 
A. Exploratory testing
B. Usability testing
C. Component testing
D. Maintainability testing
A is correct

 <<<<<< =================== >>>>>>

 
 




>>>>

No comments:

Post a Comment

To bring all feasible courses , online and easy to use...