Papers Q. 421 to 430


Q.: QC is
A. Phase building activity
B. Intermediate activity
C. End of Phase activity
D. Design activity
C is correct
 

<<<<<< =================== >>>>>> 
Q.: Which tool store information about versions and builds of software and testware
A. Test Management tool
B. Requirements management tool
C. Configuration management tool
D. Static analysis too;

C is correct
<<<<<< =================== >>>>>>
Q.: Testing Process comprised of
A. Test Plan and Test Cases
B. Test log and Test Status
C. Defect Tracking
D. All of the above

D is correct
 

<<<<<< =================== >>>>>>
Q.: Preparing and automating test  cases before coding is called

A. Test first approach
B. Test-driven development
C. Both A. & B.
D. None of the above
 
C is correct
<<<<<< =================== >>>>>>

Q.: Which one is not characteristic of test management tool?
A. Support for the management of tests and the testing activities carried out
B. Interfaces to test execution tools
C. Quantitative analysis related to tests
D. Check for consistency and undefined requirements
E. None of the above

D is correct
 
<<<<<< =================== >>>>>> 
Q.: Code Walkthrough  
A. Type of dynamic testing
B. Type of static testing
C. Neither dynamic nor static
D. Performed by the testing team
B is correct
 
<<<<<< =================== >>>>>> 
 Q.: Risk analysis talks about  
A. The data required for testing, the infrastructure requirements to manage the data as well as the methods for preparing test data, requirements, converters and sources
B. Details what types of tests must be conducted, what stages of testing are required and outlines the sequence and timing of tests
C. A testing goal. It is a statement of what the tester is expected to accomplish or validate during a testing activity. These guide the development of test cases and procedures
D. None of the above
B is correct
 
<<<<<< =================== >>>>>> 
Q.: What are the 2 major components taken into consideration with risk analysis? 
A. The probability the negative event will occur
B. The potential loss or impact associated with the event
C. Both A. and B.
D. Neither A. nor B.
C is correct
 
<<<<<< =================== >>>>>> 
 Q.: If the application is complex, but NOT data intensive and is to be tested on one configuration and 2 rounds, the easiest method to test is  
A. Manual testing
B. Automation testing
C. Both
D. None

A is correct
 
<<<<<< =================== >>>>>>
Q.: Which of the following are typical tester tasks?
A. Decide what should be automated, to what degree, and how.
B. Set up configuration management of testware; review tests developed by others.
C. Prepare and acquire test data; review tests developed by others.
D. Initiate the specification, preparation, implementation and execution of tests and monitor and control the execution.
C is correct

 <<<<<< =================== >>>>>>
Q.: Bug life cycle  
A. Open, Assigned, Fixed, Closed
B. Open, Fixed, Assigned, Closed
C. Assigned, Open, Closed, Fixed
D. Assigned, Open, Fixed, Closed

A is correct
<<<<<< =================== >>>>>>
Q.: Who is responsible for document all the issues, problems and open point that were identified during the review meeting
A. Moderator
B. Scribe
C. Reviewers  

D. Author
B is correct
<<<<<< =================== >>>>>>
Q.: A project that is in the implementation phase is six weeks behind schedule.
The delivery date for the product is four months away. The project is not allowed to slip the delivery date or compromise on the quality standards established for his product. Which of the following actions would bring this project back on schedule?  
A. Eliminate some of the requirements that have not yet been implemented.
B. Add more engineers to the project to make up for lost work.
C. Ask the current developers to work overtime until the lost work is recovered.
D. Hire more software quality assurance personnel.

A is correct
 

<<<<<< =================== >>>>>> 
Q.: Use cases can be performed to test 
A. Performance testing
B. Unit testing
C. Business scenarios
D. Static testing

C is correct
 

<<<<<< =================== >>>>>> 
Q.: The ___________ technique can be used to achieve input and output coverage 
  A. Boundary value analysis
B. Equivalence partitioning
C. Decision table testing
D. State transition testing

B is correct
 

<<<<<< =================== >>>>>> 
Q. 956: The __________ testing is performed at the developing organization�s site  
A. Unit testing
B. Regression testing
C. Alpha testing
D. Integration testing

C is correct
 

<<<<<< =================== >>>>>> 
Q.: The software engineer's role in tool selection is  
A. To identify, evaluate, and rank tools, and recommend tools to management
B. To determine what kind of tool is needed, then find it and buy it
C. To initiate the tool search and present a case to management
D. To identify, evaluate and select the tools

A is correct
 

<<<<<< =================== >>>>>> 
Q.: Which is not the software characteristics  
A. Reliability
B. Usability
C. Scalability
D. Maintainability

C is correct
 

<<<<<< =================== >>>>>> 
Q.: A Test Plan Outline contains which of the following: i. Test Items
ii. Test Scripts
iii. Test Deliverables
iv. Responsibilities
 

A. i,ii,iii are true and iv is false
B. i,iii,iv are true and ii is false
C. ii,iii are true and i and iv are false
D. i,ii are false and iii , iv are true

B is correct
 

<<<<<< =================== >>>>>> 
Q.: Which of the following is not a major task of Exit criteria? 
A. Checking test logs against the exit criteria specified in test planning.
B. Logging the outcome of test execution.
C. Assessing if more tests are needed.
D. Writing a test summary report for stakeholders.

B is correct
 

<<<<<< =================== >>>>>>  