Papers Q. 131 to 140


Q.: How much percentage of the life cycle costs of a software are spent on maintenance.
A. 10%
B. 30%
C. 50%
D. 70%
D is correct
 

<<<<<< =================== >>>>>> 
Q.: When a defect is detected and fixed then the software should be retested to confirm that the original defect has been successfully removed. This is called
A. Regression testing
B. Maintenance testing
C. Confirmation testing
D. None of the above

C is correct
<<<<<< =================== >>>>>>

Q.: Which of the following is a valid objective of an incident report?

A. Prove that the tester is contributing to the quality of the system.

B. Provides test management ideas for test process improvement.
C. Gives a statistical way to determine which modules to redesign.

D. Provides developers a way to critique their individual work processes.
 B is correct
<<<<<< =================== >>>>>>
Q.: When to stop Testing?
A. Stop when scheduled time for testing expires
B. Stop if 75% of the pre-defined number of errors is detected.

C. Stop when all the test cases execute with detecting few errors.
D. None above
 
 
A is correct  

<<<<<< =================== >>>>>>
Q.: Which of the following are success factors for reviews?

I. Clear objectives for each review.
II. Checklists and/or roles are used to increase effectiveness of defect identification.
III. There is an emphasis on process improvement.
IV. People issues and psychological aspects are not reviewed.
A. I and III
B. II, III and IV
C. I, II and III
D. IV
C is correct
<<<<<< =================== >>>>>>
Q.: Structure is unknown for which type of development project 

 A. Traditional system development
B. Iterative development

C. System maintenance
D. Purchased/contracted software

D is correct
 

<<<<<< =================== >>>>>> 
Q.: ________indicates how important it is to fix the bug and when it should be fixed 
A. Severity
B. Priority

C. All of the above
D. None of the above

C is correct
 

<<<<<< =================== >>>>>> 
Q.: The person who leads the review of the document(s), planning the review,running the meeting and follow-up after the meeting 
A. Reviewer
B. Author

C. Moderator
D. Auditor

C is correct
 

<<<<<< =================== >>>>>> 
Q.: Performs sufficient testing to evaluate every possible path and condition in the application system. The only test method that guarantees the proper functioning of the application system is called as _____________  
A. Regression Testing
B. Exhaustive Testing

C. Basic Path Testing
D. Branch Testing

C is correct

<<<<<< =================== >>>>>>
Q.: Which of the following statements contains a valuable objective for a test team?

A. Prove that the remaining defects will not cause any additional failures.

B. Run all of the tests that are defined for the test object as quickly as possible.

C. Prove that all faults have been identified through thorough testing.

D. Cause as many failures as possible so that faults can be identified and corrected.
D is correct
<<<<<< =================== >>>>>> 
Q.: Which of the following faults can be found by a static analysis tool?
I. Incorrect branch conditions logic
II. Variables which are used after being defined.
III. Variables which are defined but never used.
IV. Standards violations
V. Illegal calls to routines
A. III, IV and V
B. II only
B. I, II, III and IV
D. II, III, IV and V
A is correct
<<<<<< =================== >>>>>>
Q.: Which of the following characteristics and types of review  processes belong together?
1. Led by the author
2. Undocumented
3. No management participation
4. Led by a trained moderator or leader
5. Uses entry and exit criteria

s. Inspection
t. Technical review
u. Informal review
v. Walkthrough

A. s = 4, t = 3, u = 2 and 5, v = 1
B. s = 4 and 5, t = 3, u = 2, v = 1
C. s = 1 and 5, t = 3, u = 2, v = 4
D. s = 5, t = 4, u = 3, v = 1 and 2

B is correct 

<<<<<< =================== >>>>>> 
Q.: What statement about static analysis is true? 
A. With static analysis, defects can be found that are difficult to find with dynamic testing.
B. Compiling is not a form of static analysis.
C. When properly performed, static analysis makes functional testing redundant.
D. Static analysis finds all faults.
A is correct
 
<<<<<< =================== >>>>>> 
Q.: Which of the following statements about early test design are true and which are false? 
1. Defects found during early test design are more expensive to fix.
2. Early test design can find defects.
3. Early test design can cause changes to the requirements.
4. Early test design takes more effort.
A. 1 and 3 are true. 2 and 4 are false.
B. 2 is true. 1, 3 and 4 are false.
C. 2 and 3 are true. 1 and 4 are false.
D. 2, 3 and 4 are true. 1 is false.
C is correct
 
<<<<<< =================== >>>>>> 
Q.: Static code analysis typically identifies all but one of the following problems. Which is it? 
A. Unreachable code
B. Undeclared variables
C. Faults in the requirements
D. Too few comments
C is correct

<<<<<< =================== >>>>>>
Q.: In which document described in IEEE 829 would you find instructions for the steps to be taken for a test including set-up, logging, environment and measurement?
A. Test plan
B. Test design specification
C. Test case specification
D. Test procedure specification
D is correct
 
<<<<<< =================== >>>>>> 
Q.: With a highly experienced tester with a good business background, which approach to defining test procedures would be effective and most efficient for a project under severe time pressure? 
A. A high-level outline of the test conditions and general steps to take.
B. Every step in the test spelled out in detail.
C. A high-level outline of the test conditions with the steps to take discussed in detail with another experienced tester.
D. Detailed documentation of all test cases and careful records of each step taken in the testing.
A is correct
 
<<<<<< =================== >>>>>> 
 Q.: Put the test cases that implement the following test conditions into the best order for the test execution schedule, for a test that is checking modifications of customers on a database. 
1. Print modified customer record.
2. Change customer address: house number and street name.
3. Capture and print the on-screen error message.
4. Change customer address: postal code.
5. Confirm existing customer is on the database by opening that record.
6. Close the customer record and close the database.
7. Try to add a new customer with no details at all.
A. 5, 4, 2, 1, 3, 7, 6
B. 4, 2, 5,1, 6, 7, 3
C. 5, 4, 2, 1, 7, 3, 6
D. 5,1, 2, 3, 4, 7, 6
C is correct
 
<<<<<< =================== >>>>>> 
Q.: Why are both specification-based and structure-based testing techniques useful? 
A. They find different types of defect.
B. Using more techniques is always better.
C. Both find the same types of defect.
D. Because specifications tend to be unstructured.
A is correct 

<<<<<< =================== >>>>>> 
Q.: What is a key characteristic of structure-based testing techniques? 
A. They are mainly used to assess the structure of a specification.
B. They are used both to measure coverage and to design tests to increase coverage.
C. They are based on the skills and experience of the tester.
D. They use a formal or informal model of the software or component.
B is correct
<<<<<< =================== >>>>>>
 
  