Papers Q. 431 to 440



Q.: Structural Testing
A. Same as black box testing
B. Same as white box testing
C. Same as functional testing
D. None of the above.
B is correct
 

<<<<<< =================== >>>>>>
Q.: Which  test  approach  uses  all  combinations  of  input  values  and  preconditions?
A. Component  testing
B. Error  guessing
C. Keyword  driven  testing
D. Exhaustive  testing
 

D is correct 
<<<<<< =================== >>>>>>
Q.: Which  technique  describes  process  flows  through  a  system  based  on  its  likely  usage?
A. Data  driven  testing
B. State  transition  testing

C. Decision  table  testing
D. Use  case  testing

D is correct
<<<<<< =================== >>>>>>
Q.: Regression testing mainly helps in
A. Re-testing fixed defects
B. Checking for side-effects of fixes

C. Checking the core gaps
D. Ensuring high level sanity

B is correct
 

<<<<<< =================== >>>>>> 
Q.: Review is one of the methods of V&V. The other methods are 
A. Inspection
B. Walkthrough

C. Testing
D. All of the above

D is correct
 

<<<<<< =================== >>>>>> 
Q.: Which review is inexpensive  
A. Informal Review
B. Walkthrough

C. Technical review
D. Inspection

A is correct
 

<<<<<< =================== >>>>>> 
Q.: Following are some of the testing risks  
A. Budget, Test environment
B. Budget, Number of qualified test resources

C. Budget, Number of qualified test resources, Test environment
D. None of the above

B is correct
 

<<<<<< =================== >>>>>> 
Q.: Random Testing 
A. Program is tested randomly sampling the input.
B. A black-box testing technique

C. Both A. and B.
D. None of the above.

 A is correct
 

<<<<<< =================== >>>>>>
Q.: Which of the following is TRUE when introducing a new tool into a test environment?

A. Changes to existing test processes should not be needed with the new tool.

B. A site license will be needed to reduce the cost per seat of the tool.

C. The tool should be rolled out as quickly as possible to maximize ROI.
D. Introducing the tool to the organization should start with a pilot project.
D is correct
<<<<<< =================== >>>>>>
Q.: Reliability, usablility, efficiency are
 

A. Functional characteristics
B. Non functional characteristics

C. Both A. & B.
D. None of the above

B is correct
 

<<<<<< =================== >>>>>> 
Q.: Verification involves which of the following :-
i. Helps to check the Quality of the built product
ii. Helps to check that we have built the right product.
iii. Helps in developing the product
iv. Monitoring tool wastage and obsoleteness.
 

 A. Options i,ii,iii,iv are true.
B. i is true and ii,iii,iv are false
C. i,ii,iii are true and iv is false
D. ii is true and i,iii,iv are false

.B is correct
<<<<<< =================== >>>>>>
 

Q.: In a risk-based approach the risks identified may be used to : 
i. Determine the test technique to be employed
ii. Determine the extent of testing to be carried out
iii. Prioritize testing in an attempt to find critical defects as early as possible.
iv. Determine the cost of the project
 

A. ii is True; i, iii, iv & v are False
B. i,ii,iii are true and iv is false
C. ii & iii are True; i, iv are False
D. ii, iii & iv are True; i is false

B is correct
 

<<<<<< =================== >>>>>> 
 Q.: Hand over of Testware is a part of which Phase
A. Test Analysis and Design
B. Test Planning and control
C. Test Closure Activities
D. Evaluating exit criteria and reporting

C is correct
 

<<<<<< =================== >>>>>> 
Q.: Static analysis tools are typically used by  
A. Testers
B. Developers
C. Testers & Developers
D. None

B is correct
 

<<<<<< =================== >>>>>> 
Q.: The specification which describes steps required to operate the system and exercise test cases in order to implement the associated test design  
A. Test Case Specification
B. Test Design Specification
C. Test Procedure Specification
D. None

C is correct
 

<<<<<< =================== >>>>>> 
Q.: Test Case are grouped into Manageable (and scheduled) units are called as  
A. Test Harness
B. Test Suite
C. Test Cycle
D. Test Driver

B is correct
 

<<<<<< =================== >>>>>> 
Q.: Which of the following statements are TRUE for informal reviews? I. Easy to get started and have some benefit
II. Have no or minimal formal process
III. The process must be documented
IV. May include "paired programming"
 

A. I, II and IV
B. I and III
C. III and IV
D. I, III and IV

A is correct
 

<<<<<< =================== >>>>>> 
Q.: Which of the following statements describes a key principle of software testing? 
A. Automated tests allow better statements of confidence about the quality of software products.
B. For a software system, it is normally impossible to test all the input and output combinations.
C. Exhaustive software testing is, with enough effort and tool support, feasible for all software.
D. The purpose of software testing is demonstrating the absence of defects in software products.

B is correct
 

<<<<<< =================== >>>>>> 
Q.: Testing with out a real plan and test cases is called --- 
A. Gorilla testing
B. Monkey testing
C. Adhoc testing
D. All of the above

D is correct
 
<<<<<< =================== >>>>>> 

 

No comments:

Post a Comment

To bring all feasible courses , online and easy to use...